For the last twelve months, the Italian city of Genoa has been focused on constructing a new state-of-the-art bridge. Local civil, structural, design, electrical and mechanical engineers, construction workers, logisticians, and city planners have all been working around the clock to build a bridge across the Polcevera river valley that will reconnect the city with France, the port, and surrounding areas. Their work is almost done, but there is plenty still to do.
SCS Software are asking the community to come together and help by delivering materials, fuel, and vehicles to the construction site by way of its two depots, one at either end of the bridge. We also need to collect excavated rubble and waste, along with used vehicles from the depots and transport them back to their respective collection points.
Read the event rules and more information on the SCS Software blog
Leave a Reply
You must be logged in to post a comment.